Installation Instructions for 100mm and 150mm clips in BEAMS

Follow these steps to correctly install beam clips on purlins:

  1. Mark holes using beam clip as template 
  2. Drill holes with 13mm drill bit  
  3. Insert bolts and fix to structure and tighten 100kpa 
  4. Set laser or measure for level / measure and cut rod lengths 
  5. Install rod into Beam clip and protrude rod approximately 10mm above bottom of beam clip  
  6. Install top nut and tighten 100kpa until tight and snug to concrete 
  7. Install bottom nut and screw up approximately 100mm above bottom of threaded rod 
  8. Install 45mm retaining nut and adjust to suit level line
  9. Install bracket over pipe 
  10. Lift pipe to level and slide clip onto 45mm retaining nut until snug fit 
  11. Tighten top nut down onto bracket to 100kpa and snug to top of bracket